Steam plant, repaired, maintained, operated and installed
Boilers and steam reticulation, hot water generation, calorifiers and tanks — worked on by our own trades, in our own workshops.
Equipment record
- Equipment
- Steam boilers · calorifiers · tanks · steam lines · smoke stacks · filters
- Fuels
- Coal · light oil · gas · dual-fuel
- Systems
- Steam reticulation · hot water generation and reticulation
- Engagement
- Breakdown · repair · planned maintenance · operating contract · supply and install

Fig. Gate valves and flanged joints on a steam header · reference photograph
A boiler’s working life, and whose duty is whose
Two-part figure. First, four kinds of engagement across a boiler's working life — Install, 2 recorded; Operate, 3 recorded; Maintain, 2 recorded; Repair, 3 recorded, 10 recorded boiler projects in total. Second, who is responsible for what around that boiler, as three separate parties. The owner of the equipment: Holds the statutory duty, and appoints the approved inspection authority in writing. The approved inspection authority: Performs the statutory inspection, witnesses the hydraulic test, and issues its certificate. Aitec: Repairs and maintains the boiler and its auxiliary equipment. Prepares plant for an inspection — cleaning, opening up, removing and reinstating lagging. Overhauls and hydraulically tests valves in our own shop, with a certificate issued. Carries out the repairs an inspection calls for, alongside the authority the owner appointed. The owner's duty runs to a fixed rhythm, listed under that party: External inspection of a fire-tube steam generator every 12 months; Witnessed hydraulic test and crack detection of critical welds every 36 months. Aitec does not act as the approved inspection authority.
Where we are contracted
- 2
Install
Boilers supplied and installed, including dual-fuel. Refurbished coal and light-oil boilers supplied.
- 3
Operate
Boiler operating, and operating combined with maintenance, held under contract at institutional sites.
- 2
Maintain
Maintenance of steam boilers and auxiliary equipment. Chemical treatment of boiler water. Boiler cleaning.
- 3
Repair
Re-tube and refurbishment. Superheater repair. Valve overhaul with a test certificate issued.
Who is responsible for what
- The owner of the equipment
Holds the statutory duty, and appoints the approved inspection authority in writing.
The rhythm that duty runs to
- 12 monthsExternal inspection of a fire-tube steam generator
- 36 monthsWitnessed hydraulic test and crack detection of critical welds
- The approved inspection authority
Performs the statutory inspection, witnesses the hydraulic test, and issues its certificate.
We do not act as the approved inspection authority.
- Aitec
Repairs and maintains the boiler and its auxiliary equipment. Prepares plant for an inspection — cleaning, opening up, removing and reinstating lagging. Overhauls and hydraulically tests valves in our own shop, with a certificate issued. Carries out the repairs an inspection calls for, alongside the authority the owner appointed.
What we work on
Pressure parts and heating surfaces
The boiler itself — everything on the water and gas sides.
- Re-tube and refurbish boilers
- Superheater repair
- Chemical treatment of boiler water
- Boiler cleaning
- Soot blowers
Mountings, valves and controls
What sits on the boiler and what fires it.
- Boiler valves — new and second-hand
- Valve overhaul, all makes
- Hydraulic pressure testing, with a test certificate issuedCertificate issued
- Boiler control panels built and refurbished
- Burner overhaul and service — LPG, heavy oil and gas
- Pump overhaul, repair, replacement and installation
Steam and hot water distribution
What carries the steam and hot water to the plant it serves.
- Steam reticulation — installation, repair and service
- Steam line installation
- Hot water generation and associated reticulation
- Calorifiers and tanks
- Pipework installation and replacement
Lagging, cladding and envelope
Absorbed from insulation — applied to all of the above.
- Lagging and cladding for boilers, tanks, vessels and piping
- Cladding fabricated in stainless steel, aluminium, galvanised sheeting and chromodek
Three of our four workshops do boiler work
Why a repair does not become a chain of subcontractors.
Valve refurbishing shop
Boiler valves of all makes overhauled and hydraulically pressure tested, with a test certificate issued. Collection and delivery.
The valve work a boiler repair depends on is not subcontracted.
Electrical shop
Boiler control panels built and refurbished. Burners overhauled — LPG, heavy oil and gas. Motors and pumps repaired.
A boiler that will not fire is often an electrical or burner fault, not a pressure-part fault.
Insulation shop
Cladding fabricated for piping, boilers, tanks and vessels — stainless steel, aluminium, galvanised sheeting, chromodek.
Lagging removed for a repair or an inspection has to be made good afterwards.
Recorded boiler work
All 10 entries our project record classifies as boiler work, by engagement. Facilities are shown by type.
10of 52 recorded projects
Install 2
- Provincial hospital, GautengSupply and install dual-fuel steam boiler
- Correctional facility, MpumalangaSupply and install boiler
Operate 3
- Correctional facility, GautengOperating and maintenance of boilers
- Correctional facility, GautengOperating and maintenance of boilers
- Correctional facility, Eastern CapeOperating of boilers
Maintain 2
- Provincial health department, Free StateMaintenance of steam boilers and auxiliary equipment
- Power station, GautengChemical treatment of boiler
Repair 3
- Tyre manufacturer, KwaZulu-NatalRe-tube and refurbish boilers
- Pulp and paper producerRepairs on boiler and superheater
- Sugar producer, MpumalangaRepairs on boilers; superheater of boiler
Tell us about the boiler.
Down now, due for work, or being specified — the same details get you a straighter answer.
- Boiler make and model, if it is on the plate
- Fuel — coal, light oil, gas or dual-fuel
- Rated evaporative capacity, and design pressure if you have it
- What the plant serves — theatre, sterilisers, laundry, kitchen, process
- Whether it is running, running derated, or down
- When it was last inspected, and by whom
If the plant is down, the make and the fuel are enough. Send the rest afterwards.
This is our general line. We publish no separate breakdown number, and no promise about how quickly someone answers.